utility image, transparent gifutility image, transparent gif
utility image, transparent gifutility image, transparent gif
utility image, transparent gifutility image, transparent gif
Home
SHLGA
GRFMA
GRFMA Board
GRFMA Confidential Documents
The Scheme
Bruce Eastick North Para Flood Mitigation Dam
Hydrology Report
South Para Reservoir Modification
Lower Gawler River Works
Mapping Project
GRFMA Open Space Strategy Documents
Contact Us

spacerspacer
spacerDownloadable Filesspacer
spacerSouth Para Reservoir Modifications 2005.pdfSouth Para Reservoir Modifications 2005.pdf (55.58KB)spacer
spacerSouthParaDamUsingRiskAssessment.pdfSouth Para Dam Assessment.pdf (184.36KB)spacer
utility image, transparent gifutility image, transparent gif Home > GRFMA > The Scheme > South Para Reservoir Modification
South Para Reservoir Modification

Modifications to the South Para Reservoir dam wall and spillway are proposed that will increase the mitigation capability of the reservoir. This will have the affect of reducing the flow in the Gawler River for major storm events.

The proposal is to raise the dam wall by 1.0 metre and raise the spillway by 1.57 metres but include a 10 metre wide slot. These modifications would have the effect of constructing a flood control storage on top of the full storage level of the reservoir. A paper presented to the ANCOLD 2005 Conference that describes a risk assessment approach to upgrading the reservoir and undertaking the proposed modifications can be downloaded from this page.

Construction of these works will be undertaken at a cost to the Scheme by SA Water, possibly in conjunction with dam safety upgrading, and is planned to be completed by July 2010.

utility image, transparent gifutility image, transparent gif
utility image, transparent gifutility image, transparent gif
search  disclaimer  subscribe  site map